Listing ID #4211535
Company Information
Ask for more detail from the seller
Contact SupplierBoiler Construction is Three Pass Fully Wet Back Type. |
Designed with proper grate area and furnace volume for efficient burning of solid fuels. |
Proper Furnace Volume is provided For Liquid and Gaseous Fuels for better Combustion Efficiencies.. |
Higher boiler efficiencies as designed properly with required heating surface areas based on Fuel Type. |
Available for liquid fuels like LDO/HSD/FO/LSHS, Gaseous fuels like Natural Gas/LPG/Biogas and Solid Fuels like Bagasse, Husk, Wood, Coal and other Agro-Wastes. |
Consistent and trouble free performance under ‘Normal Operating Conditions’. |
Capacities from 1,00,000 kcal/hr to 100,00,000 kcal/hr with Maximum Water Temperatures of 230 deg.C. |