Preferred Buyer From :
India only
General care
before shutting down at the end of each shift, we recommend the following procedures :
flush hammer with air water for a few minutes, then turn off water injection.
flush hammer with airoil for a few minutes. This will coat the internal hammer parts preventing corrosion rust.
never leave the tool in a wet muddy hole. Pull back from bottom as far as necessary to prevent the hammer sitting under water.
it is also good practice to pour at least half a litre of oil down the drill at start up of a new shift.