- MOQAS REQUIRED PER TANK Piece(s)
- Supply TypeManufacturer, Exporter, Supplier, Retailer
- Preferred Buyer Location All over the world
For safe construction of steel tank as per api 650 code. single and double acting tank lifting jacking units with synchronous uniform lift model twin cylinder vertical climb capacity: 12 mt each max lifting climb 2500-3050 mm test load 18 mt each contents: 1 nos of: vertical testle 2 nos support pipes 1 nos of tresle base plate 1nos of hardened loading point, high tensile boltsnuts 1 set high pressure hydraulic hoses-1 set valves and fittings.
View More Details