- Supply TypeManufacturer, Exporter, Supplier, Retailer
- Preferred Buyer Location All over the world
The pipe is supplied with male coupler fitted at One End and other end plain. Insatllation is done at the site as follows; Clean the Plain end of the Pipe with the help of Sand Paper Insert The Pipe Centarlizer on to the Riser Pipe Apply Solvent Cement on the end of Riser Pipe and insert the pipe into fitting Rotate to 90° to ensure uniform distribution of Solvent Cement Hold the pipe for 2 minutes Wipe the excess Solvent Cement Riser Pipe is ready to be installed on borewells.