![XRotor 40A ESC Long Lead [OPTO]](https://img500.exportersindia.com/product_images/bc-500/dir_151/4521269/xrotor-40a-esc-long-lead-opto-1506321486-3353233.jpg)
Company Information
Ask for more detail from the seller
Contact SupplierSpecially optimized firmware for disc-type motors brings the outstanding compatibility
For meeting flight requirements of multi-rotors like heavy load and long flight, we usually have to increase the motor torque and efficiency, so a lot of pilots use disc-type motors to reach those mentioned requirements. However, they overlook that the consequential compatibility issue will lead many pilots to draw back. Now our XRotor ESC’s has excellent compatibility with various disc-type motors, and this can greatly reduce the possibility of air crashes caused by “locked rotor”.
Auto Timing Adjustable & Preset Parameters for Highly Intelligent Operation
Auto timing adjustment and preset parameters applicable to most applications extremely simplify operation and optimized user experience
Special Core Program for Rapid Throttle Response
The special frame structure has made the demand over ESC response become even harsher than usual, as rapid throttle response means stable hover and swift movement. With the rapid response, Xrotor circular series ESC’s definitely can handle different challenges at ease.