Post Buy Requirement
SC
Bangalore, Karnataka, India
Add Review

Electrical Panels & Distribution Box #5494722

Synchronizing Panel

These are the panels mainly made for generator systems. The AMF Panel works on the following principle: When EB Supply is OFF; the DG supply would be ON within the fraction of seconds automatically. Panel contains Control Relays, Control MCBs, Indications, ACDC Meters, Frequency meter, Energy meter, Earth Leakage Relays.At the incoming side, this panel will have two incomers usually HRC Fuses and one common switch. Through the AMF Relay, the panel works automatically.Inside the panel there will be one relay for both under & over Voltage. If the incoming supply is under voltage or over, then entire system would trip. Hooter is used in the switchgears for indication of EB supply when DG Supply is in working condition.
View Complete Details

Amf Panel

These are the panels mainly made for generator systems. The AMF Panel works on the following principle: When EB Supply is OFF; the DG supply would be ON within the fraction of seconds automatically. Panel contains Control Relays, Control MCBs, Indications, AC/DC Meters, Frequency meter, Energy meter, Earth Leakage Relays.
At the incoming side, this panel will have two incomers usually HRC Fuses and one common switch. Through the AMF Relay, the panel works automatically.
Inside the panel there will be one relay for both under & over Voltage. If the incoming supply is under voltage or over, then entire system would trip. Hooter is used in the switchgears for indication of EB supply when DG Supply is in working condition.

View Complete Details

Synchronization Panels

DG Synchronizing panels are based on AutoManual Sharing, Auto Synchronizing, Auto KW & KVAR sharing & load-dependent STARTSTOP features. Changing of schemes is made through PLC & Software will work in line with the Generator Control Package Relay that also takes care of power monitoring, communication, display as well as protection.
View Complete Details

DG Synchronization Panel

DG Synchronizing panels are based on AutoManual Sharing, Auto Synchronizing, Auto KW & KVAR sharing & load-dependent STARTSTOP features. Changing of schemes is made through PLC & Software will work in line with the Generator Control Package Relay that also takes care of power monitoring, communication, display as well as protection.
View Complete Details

EB/DG Synchronizing Panel

DG Synchronizing panels are based on Auto/Manual Sharing, Auto Synchronizing, Auto KW & KVAR sharing & load-dependent START/STOP features. Changing of schemes is made through PLC & Software will work in line with the Generator Control Package Relay that also takes care of power monitoring, communication, display as well as protection.

View Complete Details
Tell Us What are you looking for? Will call you back

Contact Us

Retailer of Electrical Panels & Distribution Box from Bangalore, Karnataka by SAMRUDDHI CONTROL EQUIPMENTS
Post Buy Requirement
SC
Bangalore, Karnataka, India
Add Review

Electrical Panels & Distribution Box #5494722

Synchronizing Panel

These are the panels mainly made for generator systems. The AMF Panel works on the following principle: When EB Supply is OFF; the DG supply would be ON within the fraction of seconds automatically. Panel contains Control Relays, Control MCBs, Indications, ACDC Meters, Frequency meter, Energy meter, Earth Leakage Relays.At the incoming side, this panel will have two incomers usually HRC Fuses and one common switch. Through the AMF Relay, the panel works automatically.Inside the panel there will be one relay for both under & over Voltage. If the incoming supply is under voltage or over, then entire system would trip. Hooter is used in the switchgears for indication of EB supply when DG Supply is in working condition.
View Complete Details

Amf Panel

These are the panels mainly made for generator systems. The AMF Panel works on the following principle: When EB Supply is OFF; the DG supply would be ON within the fraction of seconds automatically. Panel contains Control Relays, Control MCBs, Indications, AC/DC Meters, Frequency meter, Energy meter, Earth Leakage Relays.
At the incoming side, this panel will have two incomers usually HRC Fuses and one common switch. Through the AMF Relay, the panel works automatically.
Inside the panel there will be one relay for both under & over Voltage. If the incoming supply is under voltage or over, then entire system would trip. Hooter is used in the switchgears for indication of EB supply when DG Supply is in working condition.

View Complete Details

Synchronization Panels

DG Synchronizing panels are based on AutoManual Sharing, Auto Synchronizing, Auto KW & KVAR sharing & load-dependent STARTSTOP features. Changing of schemes is made through PLC & Software will work in line with the Generator Control Package Relay that also takes care of power monitoring, communication, display as well as protection.
View Complete Details

DG Synchronization Panel

DG Synchronizing panels are based on AutoManual Sharing, Auto Synchronizing, Auto KW & KVAR sharing & load-dependent STARTSTOP features. Changing of schemes is made through PLC & Software will work in line with the Generator Control Package Relay that also takes care of power monitoring, communication, display as well as protection.
View Complete Details

EB/DG Synchronizing Panel

DG Synchronizing panels are based on Auto/Manual Sharing, Auto Synchronizing, Auto KW & KVAR sharing & load-dependent START/STOP features. Changing of schemes is made through PLC & Software will work in line with the Generator Control Package Relay that also takes care of power monitoring, communication, display as well as protection.

View Complete Details
Tell Us What are you looking for? Will call you back

Contact Us