Fit the welding Machine with the dies of required pipe and fitting diameter to be processed a. connect with plug to the 230V Power supply socket. Wait until thermostat light on the machine goes off, indicating that welding machine has reached the working temperature (260° C)
Cut the pipe at right angles to axis. In Order to avoid the errors in defining the distances and direalon of the fittings, one may use pencil for markings.
Push the end of the pipe and simultaneously the fitting without turning them up to the mark. welding depth into tool. It is important to observe the heating times of assembly Parts.
After stipulated heating time, quickly remove pipe 7 fitting from the welding dies. Join them immediately and without turninng, until the marked welding depth of pipe is covered by the PP-R fitting.
After heating the joining parts don't push them vigorously. At the stage of joining, it Is possible to effect the rotatan of maximum 10 to 15 in order to perform coaxial correction.