AKRAF supplied the copper ore leaching system consisting of the agglomeration plant, the onoff leach pad, as well as the waste disposal facility. The Mobile Stacking Bridge (MSB) forms part of the stacking and reclaiming system for the onoff heap leach pad. The application of MSBs is not only restricted to operating across onoff heap leach systems and the technology can be applied across a wide range of areas. The most significant advantage of the crawler mounted MSB is its ability to operate continuously without interruption and do not require any downtime to shift or relocate. MSBs are designed with a reduced number of bridge segments which provide the following advantages: