Rack

Our offered Product range includes Operation Racks and OPERATION RACKS AND PANELS.

Operation Racks

We offer Distribution & Operation Racks and Panels. These Racks and Panels are manufactured to stringent specifications to meet varied requirements of communications and are also manufactured to customers design and specifications.
View Complete Details

OPERATION RACKS AND PANELS

These Racks and Panels are manufactured to stringent specifications to meet varied requirements of communications and are also manufactured to customers design and specifications.
I. SHOWER TEST:To check integrity of the Racks and Panels against water penetration.
Spray -
water
Flow Rate -
40 Ltrs / min. / head
Number of heads -
4
Head to Sample -
400 ? 100 mm
Sample Position -
Laying Down
Requirement -
No Water ingress
II ENVIRONMENTAL CYCLE TEST:To determine working capability of theRack and Panel for climatic conditions.

Lowest Temp. -
-15C
Highest Temp. -

60C
Dwell Time -
4 Hrs.
Transition Time -
2 Hrs.
Cycle Duration -
10:30 Hrs.
Number of Cycles -
10

III VIBRATION TEST:To check effect of Vibrations caused due to tempest, storm and other inclement weather conditions.

Planes -
3 (X, Y & Z axis)
Sweep -

(10-300) Hz 2% at 1 octare10% per min.

(a) Sine Sweep (10-28) ?? 1 Hz. 0.1 (2.5mm) double amplitude

Time -
2 Hrs. each axis

These Racks and Panels are tested for axial Tension of 70 Newtons applied longitudinally for 10 min. on the cables and for Pig Tails / Patch Cords the test is conducted at 25 Newtons for 10 min. (to simulate effect of accidental pull).