My ExportersIndia

For Buyer

For Seller

For Help

Our Products

  1. Woodworking Tools And Machines 5 Products available
  2. Dryers 5 Products available
  3. Electric Sander 4 Products available
  4. Industrial Blowers, Coolers & Fans 4 Products available
  5. Construction Machinery & Equipment 3 Products available
  6. Lathe Machines 2 Products available
  7. Cutting Machine 2 Products available
  8. Cooling Tower 2 Products available
  9. Cutting Machines & Equipment 2 Products available
  10. Coffee Mugs, Teapot & Tea Sets 2 Products available
  11. Crusher, Shredder & Presses 2 Products available
  12. Chemical Machinery & Plant 1 Products available
  13. Hydraulic Press 1 Products available
  14. Boilers 1 Products available
  15. Power Saws 1 Products available
  16. Machines And Equipments 1 Products available
  17. Sealing & Strapping Machines 1 Products available
  18. Rolling Machine 1 Products available
  19. Grinding Machine 1 Products available
  20. Bamboo 1 Products available
  21. Foam Sheets 1 Products available
  22. Roll Forming & Bending Machines 1 Products available
  23. Wire Making & Cabling Machines 1 Products available
  24. Kilns 1 Products available
  25. Industrial Machinery 1 Products available
  26. Cnc And Lathe Machinery 1 Products available
  27. Plastic Machine 1 Products available
  28. Floor Mats 1 Products available
  29. Scissor Lifts 1 Products available
  30. Others Products 8 Products available

Boilers

We offer a complete product range of Briquette Fired Package Boiler

Briquette Fired Package Boiler

  • a) Main steam stop valve 1 No.ELEMS / CARONA
  • b) Steam Safety Valve 2 No.BRITECH / EQU
  • c) Water level gauge with protectors 2 Sets LEVCON / RUSHAS
  • d) Accessible feed check valve 2 No.ELEMS / CARONA
  • e) Blow down valve 1 No. LEVCON
  • f) Fusible plug 1 No. ELEMS
  • g) Pressure gauge with siphon 1 No.H GURU / GLUCK
  • h) Air vent valve 1 No.ELEMS
  • i) Pressure Switch 1 No.INDFOSS

HORIZONTAL 3 PASS Wood / Briquette Fired Package Boiler (Wet Back Design )having an evaporation capacity of 2000 kgs/hr of steam from and at 100C with working pressure of 10.54 kg/Sq.cm (150 PSI) along with standard Boiler mountings & fittings.
STANDARD BOILER MOUNTINGS & FITTINGS:MAKESa) Main steam stop valve:1 No.ELEMS / CARONAb) Steam Safety Valve:2 No.BRITECH / EQUc) Water level gauge with protectors:2 Sets LEVCON / RUSHASd) Accessible feed check valve:2 No.ELEMS / CARONAe) Blow down valve:1 No. LEVCONf) Fusible plug:1 No. ELEMSg) Pressure gauge with siphon:1 No.H GURU / GLUCKh) Air vent valve:1 No.ELEMSi) Pressure Switch:1 No.INDFOSS
PUMPING ARRANGEMENT:
PAINTINGS AND REFRACTORY:To minimize radiation units are protected with Boiler heatproof paint inside and outside. Painted in attractive colors. Return chamber are caste with special heat resistive refectory of ACC super crate cement which minimizes radiation losses.

LADDER PLATFORM & COVER :Main boiler is mounted on strong and studychair, Ladder and platform are provided for easy accesses to valves & mounting onboiler. Our unique constructions helps fast installation at site, needs negligiblefoundation. Required number of mud holes and a large size elliptical manhole is alsoprovided for easy cleaning operation.

DRAUGHT FAN:One No. ID FAN of suitable capacity Mounted on a base frame along with Pulley, V Belt coupled with suitable motor shall be supplied alongwith the Boiler, Designed for 1440 RPM.

One No. FD Fanof suitable capacity directly Coupled with suitable motor shall besupplied alongwith the Boiler.

CONTROL PANEL : One No. Electrical control panel with contactors, switches, starters, HRC fuses, relays, terminals, along with push button switch, pilot lamps, Rotary ON/OFF switch etc, for convenient operation.

WATER LEVEL CONTROL SYSTEM:One Water level control system (Mobrey control) side to side entry to regulate high/low water level controls to the boiler
CONSTRUCTION:The Boiler offered as above, will be designed and manufactured by us as per INDIAN BOILER REGULATIONS -1950 ISOR - 831 with latest amendments. Strict quality control is maintained throughout the construction of the Boiler. A complete set of drawings and documents certified by the Inspecting authority of the State of its origin will be furnished by us within three to four weeks from the date of dispatch of the boiler.

Note: the offer Excludes supply of Chimney , civil works & any air or flue gas ducting.

View Complete Details
Tell Us What are you looking for? Will call you back

Contact Us