- Supply TypeSupplier, Retailer
- Preferred Buyer Location India only
This 2000 tr cooling tower replaced a mechanical draft cooling tower in the same basin with minor adjustments. Supplied in year 2004. Pay-back period in terms of energy saving was 9 months. The bonus of avoided plant shut-down was additional saving. size: 16.8 x 4.8 x 6.0 water circulation: 1200 cu.m/hr, cooling capacity: 2000 tr