- Supply TypeManufacturer, Exporter, Supplier, Retailer
- Preferred Buyer Location All over the world
Operations of the relay can be tested by means of a test, button which energies the output relays & LED’s after set time delay with the channels set to underover frequency operation. Access to the test push button requires removal of the front cover. This test facility should normally only be used with the relay trip circuits isolated, The relays are suitable for any application in industrial plants & to generators where definite time underover frequency protection is required.